韩国性爱视频,国产美女裸体,18禁视频在线看,黄色爱爱日本

Drilling Method of Underground Clearance of Full Circle Casi

Full rotary drilling rig without leaving the pile construction technology is: the whole rotary equipment is able to drive the steel casing for 360 ° rotation, and steel casing press and removal of the construction machinery. The equipment in the operation to produce the next pressure and torque, driving steel casing rotation, the use of high-strength nozzle tip of the soil, rock and reinforced concrete and other obstacles to cut, the use of casing wall effect, and then use hydraulic punch Bucket will be caught inside the steel casing, in the casing within the clearance pile piling operations. After the completion of the barrier, the steel casing backfill cement construction. Backfill can be used to build a better plastic shield construction, and mixed with 7% -10% cement. In the backfill process, pay attention to keep the steel sleeve is lower than the backfill cement top elevation ≥ 2m; when the steel casing is fully removed, the cement soil is also filled to the ground. As the backfill is looser, in order to avoid the adverse effects of late settlement on the surrounding environment, the backfill is filled with grouting immediately after completion of the backfill to ensure the strength of the backfill. The complete set of equipment includes full rotary drive, steel casing, hydraulic punching, in order to achieve the cutting of large volume of concrete after the broken, in some cases also equipped with special drill, in addition, also equipped with a crawler crane, hydraulic punch The use of the grab at the same time provides a balanced reaction force for the sleeve torque. Full rotary power equipment is mainly for the casing 360 ° rotation and cutting head to provide obstacles, including the upper and lower hoop clamping system and a vertical jacking system. The hoop clamping system is the main locking system, which is clamped by the hydraulic drive to provide the drive torque and downward force into the casing. The diameter of the standard casing is 1000 to 3000 mm. If the diameter of the casing is small, it can be applied to the inside of the hoop system. Under the hoop clamping system for the auxiliary locking system, in the process of pulling the top of the casing, the next clamping device alternately on the casing to prevent the casing to fall. The vertical jacking system is mainly used for top-up of the casing. Driving system can provide the maximum pressure into the fuselage of the weight, when the press force is not enough to increase the weight of the case. In the process of casing rotation, in order to prevent the body's own weight, when the press force is not enough to increase the weight of the case. In the casing rotation process, in order to prevent the fuselage along with the casing with a dedicated anti-torque lock to lock the fuselage. The driving device can adjust the steering torque, slewing speed, pressing force and clamping force of the casing arbitrarily within the working ability of the equipment. Rotation speed set high, medium and low third gear speed, according to casing diameter, geological conditions and changes in torque and so choose the most appropriate speed of rotation. Horizontal adjustment cylinder with a dedicated hydraulic circuit, so the casing can also adjust the vertical rotation.
武威市| 深夜男人日韩欧美| 日韩视频一本无码| 国模精品| 国产流白浆| 欧美日韩性爱精品| 内射一区| CAOPORN国产精品免费| 亚洲宅男天堂| 亚洲一区二区视频在线| abilities| 勃利县| 人人妻人人妻| 四房色播在线电影| 黄片专区| 欧美人妻精品一区二区在线| 色一情一乱一乱一区99av| 中文字幕视频在线| 亚洲中文无吗一区| 亚洲女人天堂成人av在线| 日韩无矿砖一线二线卡乱| 丰满多水的寡妇| 国产精品免费视频网站| 午夜电影亚洲AV无码一区二区| 久久久久久影院| 日韩福利| 色av手机在线| 久久久99精品免费观看| 动态av| 高清无码不卡在线观看| 国产一区二区精品| 亚洲综合色丁香婷婷六月图片| 天堂а√在线中文在线新版| 丁香五月综合久久激情| 亚洲一区亚洲一区| 欧美国产日韩a在线观看| 91日本| HEYZO综合无码一区| 国产香蕉和进口香蕉的价格比较| 99热亚洲| 国产不卡三级电影|